Thank you for your patience while we retrieve your images.
Taken 15-Oct-14
Visitors 0


5 of 5 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions3000 x 1996
Original file size3.4 MB
Image typeJPEG
Color spaceAdobe RGB (1998)
Date taken15-Oct-14 13:43
Date modified15-Oct-14 14:41
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D3
Focal length14 mm
Focal length (35mm)14 mm
Max lens aperturef/2.8
Exposure1/2500 at f/4
FlashNot fired
Exposure bias0 EV
Exposure modeManual
Exposure prog.Manual
ISO speedISO 800
Metering modePattern
Digital zoom1x
20141015-21982-SR

20141015-21982-SR

A survey post for a section of County Road 200E that will be redirected west of the new Interstate 65 and Worthsville Road interchange. Work will start immediately on this phase of the Worthsville Road and Interstate 65 interchange. Scott Roberson / Daily Journal