Thank you for your patience while we retrieve your images.
Taken 14-Aug-13
Visitors 3


1 of 6 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions2151 x 3000
Original file size2.1 MB
Image typeJPEG
Color spacesRGB
Date taken14-Aug-13 10:12
Date modified15-Aug-13 15:18
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D3S
Focal length19 mm
Focal length (35mm)19 mm
Max lens aperturef/2.8
Exposure1/1250 at f/5.6
FlashNot fired
Exposure bias0 EV
Exposure modeManual
Exposure prog.Manual
ISO speedISO 200
Metering modePattern
Digital zoom1x
20130814-_8482-SR

20130814-_8482-SR

Workers continue to repair the Greenwood Presbyterian's historic bell tower and turret. The 114-year-old structure was in need of repairs. The tower was leaking water, bricks had chipped off, slate roofing tiles had fallen to the ground, and timbers inside were rotting. Work is expected to be done in September. Scott Roberson / Daily Journal