Thank you for your patience while we retrieve your images.
Taken 9-Oct-13
Visitors 2


1 of 10 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions3000 x 1942
Original file size2.15 MB
Image typeJPEG
Color spacesRGB
Date taken9-Oct-13 14:10
Date modified11-Oct-13 10:19
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D3S
Focal length135 mm
Focal length (35mm)135 mm
Max lens aperturef/2.8
Exposure1/2000 at f/5.6
FlashNot fired
Exposure bias0 EV
Exposure modeManual
Exposure prog.Manual
ISO speedISO 200
Metering modePattern
Digital zoom1x
20131009-_4702-SR

20131009-_4702-SR

Workers prepare to pour concrete on a section of Interstate 65 as work continues at the south split Wednesday. Work has reached the halfway point and is expected to be complete by Oct. 29. Scott Roberson / Daily Journal