Thank you for your patience while we retrieve your images.
Taken 18-Aug-14
Visitors 0


3 of 5 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions2784 x 1848
Original file size913 KB
Image typeJPEG
Color spacesRGB
Date taken18-Aug-14 13:51
Date modified18-Aug-14 15:38
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D3S
Focal length200 mm
Focal length (35mm)300 mm
Max lens aperturef/2.8
Exposure1/1250 at f/4.5
FlashNot fired
Exposure bias0 EV
Exposure modeManual
Exposure prog.Manual
ISO speedISO 200
Metering modeCenter-weighted average
Digital zoom1.5x
20140818-_6981-SR

20140818-_6981-SR

Greenwood started a project to widen Worthsville Road, between U.S. 31 and Interstate 65 in preparation for a new interchange planned to be built next year. The city had planned to open the stretch of road between U.S. 31 and the railroad tracks by winter, but work to move utility lines was delayed. Workers have instead been doing work on other sections of the road, including between the railroad tracks and Sheek Road. Scott Roberson / Daily Journal