Thank you for your patience while we retrieve your images.
Taken 12-Feb-14
Visitors 3


2 of 4 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions3000 x 1869
Original file size1.34 MB
Image typeJPEG
Color spaceAdobe RGB (1998)
Date taken12-Feb-14 09:46
Date modified12-Feb-14 11:51
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D3S
Focal length18 mm
Focal length (35mm)18 mm
Max lens aperturef/2.8
Exposure1/6400 at f/4
FlashNot fired
Exposure bias0 EV
Exposure prog.Manual
ISO speedISO 400
Metering modeCenter-weighted average
20140212-40668-SR

20140212-40668-SR

This property west of Interstate 65 and north of Worthsville Road will be needed to make way for the new interchange. The state has delayed construction of the new I-65 interchange on Worthsville Road for a year because acquiring the property is taking longer than expected. Scott Roberson / Scott Roberson / Daily Journal