Thank you for your patience while we retrieve your images.
Taken 4-Oct-15
Visitors 0


7 of 11 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions3000 x 2041
Original file size1.97 MB
Image typeJPEG
Color spaceAdobe RGB (1998)
Date taken5-Oct-15 07:46
Date modified5-Oct-15 10:46
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D4S
Focal length130 mm
Focal length (35mm)130 mm
Max lens aperturef/2.8
Exposure1/1250 at f/5
FlashNot fired
Exposure bias0 EV
Exposure modeManual
Exposure prog.Manual
ISO speedISO 320
Metering modePattern
Digital zoom1x
20151005-16742-SR

20151005-16742-SR

A worker prepares a section of King Street for paving on Monday as crews do patching and pavement overlay work. Contractors are coordinating road repairs with water main replacement projects by Indiana American Water to reduce inconvenience to motorists and residents. Scott Roberson / Daily Journal