Thank you for your patience while we retrieve your images.
Taken 27-Mar-14
Visitors 1


5 of 5 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions1996 x 3000
Original file size1.23 MB
Image typeJPEG
Color spacesRGB
Date taken27-Mar-14 12:35
Date modified27-Mar-14 15:21
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D3S
Focal length155 mm
Focal length (35mm)155 mm
Max lens aperturef/2.8
Exposure1/800 at f/4
FlashNot fired
Exposure bias0 EV
Exposure modeManual
Exposure prog.Manual
ISO speedISO 400
Metering modeCenter-weighted average
Digital zoom1x
20140327-_9515-SR

20140327-_9515-SR

Flags and stakes line North Main Street on Thursday. Construction crews will close the first section of road between Graham Street and Oliver Avenue next week. That section will be closed for two to three months. Franklin is rebuilding the road from Graham Street to U.S. 31. Sections of the road will be closed for two to three months each. Construction on North Main Street is expected to last until November. Workers are rebuilding the roadway, building new sidewalks and putting in decorative lighting and landscaping. Scott Roberson / Daily Journal