Thank you for your patience while we retrieve your images.
Taken 27-Apr-20
Visitors 3


9 of 12 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:road work, road construction
Photo Info

Dimensions3000 x 2085
Original file size3.19 MB
Image typeJPEG
Color spaceAdobe RGB (1998)
Date taken27-Apr-20 10:27
Date modified27-Apr-20 14:28
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D4S
Focal length190 mm
Focal length (35mm)190 mm
Max lens aperturef/2.8
Exposure1/2000 at f/2.8
FlashNot fired
Exposure bias0 EV
Exposure modeManual
Exposure prog.Manual
ISO speedISO 100
Metering modePattern
Digital zoom1x

Work is set to begin this year on the second phase of the Madison Avenue reconstruction from Noble Street to Fry Road.