Daily Journal | Center Grove elementaries??? upgrades part of security plan | 20130926-_0955-SR
Taken 26-Sep-13
Visitors 1


2 of 10 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions3000 x 1748
Original file size1.14 MB
Image typeJPEG
Color spacesRGB
Date taken26-Sep-13 09:48
Date modified26-Sep-13 14:13
Shooting Conditions

Camera makeNIKON CORPORATION
Camera modelNIKON D3S
Focal length20 mm
Focal length (35mm)20 mm
Max lens aperturef/2.8
Exposure1/160 at f/5.6
FlashNot fired
Exposure bias0 EV
Exposure modeManual
Exposure prog.Manual
ISO speedISO 4000
Metering modePattern
Digital zoom1x
20130926-_0955-SR

20130926-_0955-SR

Center Grove Elementary School students walk past the stage during gym class Thursday. A planned construction project would include a new gymnasium and expanding the kitchen and lunchrooms by using part of the existing gym. The remainder will become a large group instruction room which will include the stage. Scott Roberson / Daily Journal